Introduction

With its high loading capacity, the Pecco and Quadshore supports (Safety Working Load 200kN and 365kN, respectively) are means to reduce construction cost per unit area. The supports are designed in perfect symmetric shape and can be easily braced by single scaffold tube and coupler. The main body of the Pecco and Quadshore supports vary in length to accommodate the site's height   requirement. Support jacks are used on the upper and lower ends of the supports (connected by bolts and nuts) so that the total height can be adjustable, varying 280-580mm for Pecco and 298-512mm for Quadshore. Note: in order to maintain overall stability of the support, special attention should be made when the height of the erected support bodies are to increase for the structure.

 

Advantages

 

Basic Components

Job Reference

Main Contractor Contract / Project Site
 Able Contractors Limited   Contract No. SS F501 Design and Construction of Redevelopment of Queen Mary Hospital at Pok Fu Lam Road, Hong Kong, Phase 1 - Main Works
 China State Construction Engineering (Hong Kong) Ltd  Construction of Public Rental Housing
Development at Shatin Area 52 Phase 3 &   4
 Gammon Construction Ltd  TKW/1/002 - Redevelopment at Ma Tau Wai Road
/ Chun Tin Street Project
 Gammon Engineering & Construction Co Ltd  Residential Development at KIL 11257,
Sheung Shing Street, Ho Man Tin
 Gammon Engineering & Construction Co Ltd  Residential Development at TPTL No. 214,
Fo Yin Road, Pak Shek Kok, Tai Po
 Leighton Contractors (Asia) Ltd  H2634 - Contract No. SS C505 - Construction
of Liantang / Heung Yuen Wai Boundary Control Point
 New World Construction Company Limited  New World Centre Remodeling
 Nishimatsu Construction Co Ltd  Contract 902 Nam Fung Tunnel and Ventilation Buildings
 Hip Hing Construction Co Ltd  Proposed Residential Development at
Lohas Park Package 5, Tseung Kwan O
 Chun Wo Construction Co Ltd  Design and Construction of Redevelopment
of Kwai Chung Hospital (Phase 1)
 Shui On Building Contractors Ltd  Consturction of Public Rental Housing
Development at Shek Kip Mei Estate Phase 3, 6 & 7
 Yau Lee Construction Co Ltd  Contract No. SSD502 Design and Construction of
Kwun Tong Staff Quarters at 4 Tseung Kwan O Road, Kowloon
 CR Construction Company Limited  Building Construction - Composite
Development Project in Kwun Tong
 China Overseas Building Construction Ltd  Proposed Residential Development at S.T.T.L
605, Lok Wo Sha Lane, Ma On Shan
 Unistress Building Construction Ltd  Carcass Works Contract for URA Hai Tan Street / Kweilin Street and Pei Ho  Street Development at NKIL 6506, Sham Shui Po, Kowloon
 Dragages Hong Kong Limited  Contract No. CV/2012/08 Liantang / Heung Yuen Wai
Boundary Control Point Site Formation and Infrastructure Works
 Leader Joint Venture  Contract 1106 Diamond Hill Sttation Extension

 

 

           © 2020 Canyon Metal Scaffolding Engineering Limited. All Rights Reserved