Canyon's warehouse in Sheung Shui provides quality reconditioning for all our products ensuring safety and reliability when product is   delivered to our clients.
 Working platform showcasing the flexibility of our different systems - Ringlock, Quadshore Support designed to work together to meet   customer requirements at Kwai Chung Estate Phase 5A.
 All our products and design concepts provide a safe and reliable working environment without causing any road closures or disruptions,   especially for overpass constructions.
 One of Canyon's largest ongoing projects - development of the SCL 1106 Diamond Hill MTR station, contributing product rental, design   concepts and erection/dismantle works.
 Ringlock system at work - Full usage of horizontal, vertical, diagonal braces plus support jacks to form support for retrofitting of noise barrier   on Tseung Kwan O Road, Kwun Tong.
 Ringlock System - one of Canyon's most popular items since our Engineering team can design for any challenging and unique building shapes   and situations.
 Toyo framework and its components are most commonly found for construction of formwork and shoring support.                                                  
 Canyon's design team utilizes versatility with the Ringlock system to tackle construction of nonstandard shapes, like here the chimney   maintenance for Tuen Mun CLP.
 Debut of Canyon's Ringlock Giantshore at one of Hong Kong's latest tunnel project sites, maximizing the loading capacity of a standard Pecco   support by 2.9 times and optimizing efficiency by using standard Ringlock components as connecting members.
  RINGLOCK SCAFFOLD SYSTEM

Versatile in design, the Ringlock system provides efficiency in assembly and flexibility. With a rosette providing eight positions for connection, the Ringlock system can be easily designed for challenging shape structures.

Designed to provide optimal efficiency to support beam and slab structures on project sites by combining two standard scaffold components: a Ringlock vertical member and an adjustable screw jack. 

  HEAVY DUTY SUPPORT

The symmetrical design of the main body provides support for heavier loading (Pecco 200kN / Quadshore 365kN) while maintaining an easy bracing method by using a scaffold tube and coupler. 

Optimal heavy duty support design that can be used seamlessly with standard Ringlock components as well as scaffold tubes and couplers for non-standard lengths.


  ALUMINIUM LORRY ACCESS LADDER

Canyon's patented design, this ladder provides safe, convenient and reliable access to lorry containers by installing it onto a standard lorry sideboard (Max. 670mm).


  TOYO SYSTEM (LIGHT DUTY)

Typical falsework system commonly used for support of lighter load, the frame structure allows for easier comprehension of falsework design so the erection process can be simplified.                                                                          

  TEMPORARY EDGE PROTECTION

Challenging sheet pile environments can be overcome with Canyon's meticulously designed Sheet Pile Guardpost and Cantilever Bracket by providing temporary edge protection and walkway(s) for site workers.



  ADJUSTABLE STAIRCASE

The site's restrictions pose no challenge to these products as they are flexibly designed to be used on slope works or external terrain surfaces; both individual steps and staircases are adjustable to suit the user's needs.                                                  



  TEMPORARY ACCESS CATCH BASE

Provides temporary walkway over excavation sites by clamping onto I-beam struts and pairing with typical scaffold components and accessories. This system provides ultimate efficiency for access across an excavated site.



  SCAFFOLDING ACCESSORIES

Canyon provides a wide variety of conventional scaffolding accessories to be used in conjunction with typical scaffolding systems or as its own stand-alone component.




Image
    QUALITY MANAGEMENT SYSTEM (QMS)   CONTACT
        Canyon has been ISO 9001 certified since 2007 and operates its Quality Management     Room 605-606, 6/F, Westlands Centre,
  System in compliance with the ISO 9001 Standard. Our company firmly believes       20 Westlands Road, Quarry Bay, Hong Kong
  in maintaining a “Process Approach” to ensure company objectives are met     (852) 2885 9633
  and an effective management system is upheld, while customer requirements     (852) 2567 1611
  are satisfied & always looking for continual improvement.     general@canyonhk.com