Image

INTRODUCTION

The Ringlock scaffold system has been designed to provide efficient assembly, low maintenance, versatility in application, galvanized components for corrosion resistance, and best of all, an installation that does not require any special tools (hammer and spirit level only). A full range of compatible accessories are available to ensure safety requirements are met and scaffold design are optimized, such as guardrails, catwalk, toeboard, catch fan, vertical with jack, ladder & staircase access, etc. With proven performance history on numerous sites and meeting various statutory bodies' requirements, the Ringlock scaffold system excels at its flexibility to connect its vertical post at eight positions around the rosette. This versatility allows for curved or angled structures, and odd-shaped falsework for challenging buildings.

ADVANTAGES

Image

STANDARD MOBILE WORKING PLATFORM

Image

BASIC COMPONENTS

Item Name
Base CollarBase PlateBase Plate Jack
Board BearerBracketCatch Fan Post
CatwalkDiagonal BraceDouble Beam Clamp
Double CouplerFork Head JackGiant Shore Body
Giant Shore JackGiantshore U-HeadHanging Ladder
HorizontalJack HolderO-Bridging Horizontal
Open-Top CatwalkQuad Base CollarQuad Head
Rosette ClampSoldier ConnectorSpigot
Spigot CouplerStabilizerStaircase
Staircase HandrailSteel Supporting BracketSwing Gate
Swivel Base Plate JackSwivel CouplerSwivel Castor with Jack Stem
TrussToeboardU-Head
VerticalWall TieWall Tie (Angle Type)


JOB REFERENCE

Main ContractorContract / Project Site
 Gammon Construction Limited

 Foundation Works for Proposed Property
Development of West Rail Tsuen Wan West Station TW5

 Dragages - China Harbour - VSL Joint Venture Contract No. HY/2011/09 Hong Kong
-Zhuhai - Macao Bridge Hong Kong Link Road
 Bachy Soletanche - Laing O' Rourke Joint Venture Contract 811A West Kowloon Terminus Approach Tunnel (North)
 Gammon - Leighton Joint Venture Contract 811B West Kowloon Terminus Approach Tunnel (South)
 Leighton Contractor (Asia) Ltd Contract 1112 Hung Hom Station and Stabling Sidings
 Penta - Ocean Construction Co Ltd Redevelopment of Queen Mary Hospital Phase 1 - Conversion of SSQ
 Penta - Ocean Construction Co Ltd Contract 1102 Hin Keng Station and Approach Structures
 Kaden - Chun Wo Joint Venture Contract 1108 Kai Tak Station and Associated Tunnels
 Shui Wing Engineering Company Limited Central Police Station Conservation and Revitalisation Project
 Chun Wo - CRGL Joint Venture Contract No. HK/2009/02 Wan Chai Development
Phase II- Central - Wan Chai Bypass at  Wan Chai East
 Chun Wo - Leader Joint Venture Contract No. HK/2009/01 Wan Chai Development Phase II - Central
- Wan Chai Bypass at Hong Kong Convention and Exhibition Centre
 Kier - Laing O'Rourke - Kaden Joint Venture Contract 901 Admiralty Integrated Station and SCL Enabli
 Nishimatsu Construction Co Ltd Contract 902 Nam Fung Tunnel and Ventilation Buidlings
 Leighton - Gammon Joint Venture Contract 810A West Kowloon Teminus Station North
 Gammon Building Construction Limited Proposed Residential Tower at 25-35 Seymour Road Hong Kong
 Leader Joint Venture Contract 1106 Diamond Hill Station Extension
 Vinci Contruction Grands Projets Contract 1103 Hin Keng to Diamond Hill tunnels
and Fung Tak Public Transport Interchange
 Kier - Kaden - OSSA Joint Venture Contact 824 Ngau Tam Mei to Tai Kong Po Tunnels
 Sun Fook Kong (Civil) Limited Contract No. HY/2012/11 Provision of Barrier-free Access
Facilities for Highway Structures - Phase 3 Contract 1
 Kone Elevator (HK) Ltd Contract 847 Lifts
 Otis Elevator Company (H.K.) Ltd Two International Finance Centre
 Leighton Contractor (Asia) Ltd H2634 - Contract No. SS C505 - Construction of
Liantang / Heung Yuen Wai Boundary Control Point
 Hip Hing Joint Venture (VEC) Tsing Yi Vehicle Examination Centre
Image
    QUALITY MANAGEMENT SYSTEM (QMS)   CONTACT
        Canyon has been ISO 9001 certified since 2007 and operates its Quality Management     Room 605-606, 6/F, Westlands Centre,
  System in compliance with the ISO 9001 Standard. Our company firmly believes       20 Westlands Road, Quarry Bay, Hong Kong
  in maintaining a “Process Approach” to ensure company objectives are met     (852) 2885 9633
  and an effective management system is upheld, while customer requirements     (852) 2567 1611
  are satisfied & always looking for continual improvement.     general@canyonhk.com