INTRODUCTION
The Ringlock scaffold system has been designed to provide efficient assembly, low maintenance, versatility in application, galvanized components for corrosion resistance, and best of all, an installation that does not require any special tools (hammer and spirit level only). A full range of compatible accessories are available to ensure safety requirements are met and scaffold design are optimized, such as guardrails, catwalk, toeboard, catch fan, vertical with jack, ladder & staircase access, etc. With proven performance history on numerous sites and meeting various statutory bodies' requirements, the Ringlock scaffold system excels at its flexibility to connect its vertical post at eight positions around the rosette. This versatility allows for curved or angled structures, and odd-shaped falsework for challenging buildings.
ADVANTAGES
STANDARD MOBILE WORKING PLATFORM
BASIC COMPONENTS
Item Name | ||
Base Collar | Base Plate | Base Plate Jack |
Board Bearer | Bracket | Catch Fan Post |
Catwalk | Diagonal Brace | Double Beam Clamp |
Double Coupler | Fork Head Jack | Giant Shore Body |
Giant Shore Jack | Giantshore U-Head | Hanging Ladder |
Horizontal | Jack Holder | O-Bridging Horizontal |
Open-Top Catwalk | Quad Base Collar | Quad Head |
Rosette Clamp | Soldier Connector | Spigot |
Spigot Coupler | Stabilizer | Staircase |
Staircase Handrail | Steel Supporting Bracket | Swing Gate |
Swivel Base Plate Jack | Swivel Coupler | Swivel Castor with Jack Stem |
Truss | Toeboard | U-Head |
Vertical | Wall Tie | Wall Tie (Angle Type) |
JOB REFERENCE
Main Contractor | Contract / Project Site |
Gammon Construction Limited | Foundation Works for Proposed Property |
Dragages - China Harbour - VSL Joint Venture | Contract No. HY/2011/09 Hong Kong -Zhuhai - Macao Bridge Hong Kong Link Road |
Bachy Soletanche - Laing O' Rourke Joint Venture | Contract 811A West Kowloon Terminus Approach Tunnel (North) |
Gammon - Leighton Joint Venture | Contract 811B West Kowloon Terminus Approach Tunnel (South) |
Leighton Contractor (Asia) Ltd | Contract 1112 Hung Hom Station and Stabling Sidings |
Penta - Ocean Construction Co Ltd | Redevelopment of Queen Mary Hospital Phase 1 - Conversion of SSQ |
Penta - Ocean Construction Co Ltd | Contract 1102 Hin Keng Station and Approach Structures |
Kaden - Chun Wo Joint Venture | Contract 1108 Kai Tak Station and Associated Tunnels |
Shui Wing Engineering Company Limited | Central Police Station Conservation and Revitalisation Project |
Chun Wo - CRGL Joint Venture | Contract No. HK/2009/02 Wan Chai Development Phase II- Central - Wan Chai Bypass at Wan Chai East |
Chun Wo - Leader Joint Venture | Contract No. HK/2009/01 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre |
Kier - Laing O'Rourke - Kaden Joint Venture | Contract 901 Admiralty Integrated Station and SCL Enabli |
Nishimatsu Construction Co Ltd | Contract 902 Nam Fung Tunnel and Ventilation Buidlings |
Leighton - Gammon Joint Venture | Contract 810A West Kowloon Teminus Station North |
Gammon Building Construction Limited | Proposed Residential Tower at 25-35 Seymour Road Hong Kong |
Leader Joint Venture | Contract 1106 Diamond Hill Station Extension |
Vinci Contruction Grands Projets | Contract 1103 Hin Keng to Diamond Hill tunnels and Fung Tak Public Transport Interchange |
Kier - Kaden - OSSA Joint Venture | Contact 824 Ngau Tam Mei to Tai Kong Po Tunnels |
Sun Fook Kong (Civil) Limited | Contract No. HY/2012/11 Provision of Barrier-free Access Facilities for Highway Structures - Phase 3 Contract 1 |
Kone Elevator (HK) Ltd | Contract 847 Lifts |
Otis Elevator Company (H.K.) Ltd | Two International Finance Centre |
Leighton Contractor (Asia) Ltd | H2634 - Contract No. SS C505 - Construction of Liantang / Heung Yuen Wai Boundary Control Point |
Hip Hing Joint Venture (VEC) | Tsing Yi Vehicle Examination Centre |