INTRODUCTION
With its high loading capacity, the Pecco and Quadshore supports (Safety Working Load 200kN and 365kN, respectively) are means to reduce construction cost per unit area. The supports are designed in perfect symmetric shape and can be easily braced by single scaffold tube and coupler. The main body of the Pecco and Quadshore supports vary in length to accommodate the site's height requirement. Support jacks are used on the upper and lower ends of the supports (connected by bolts and nuts) so that the total height can be adjustable, varying 280-580mm for Pecco and 298-512mm for Quadshore. Note: in order to maintain overall stability of the support, special attention should be made when the height of the erected support bodies are to increase for the structure.
ADVANTAGES
BASIC COMPONENTS
JOB REFERENCE
Main Contractor | Contract / Project Site |
Able Contractors Limited | Contract No. SS F501 Design and Construction of Redevelopment of Queen Mary Hospital at Pok Fu Lam Road, Hong Kong, Phase 1 - Main Works |
China State Construction Engineering (Hong Kong) Ltd | Construction of Public Rental Housing Development at Shatin Area 52 Phase 3 & 4 |
Gammon Construction Ltd | TKW/1/002 - Redevelopment at Ma Tau Wai Road / Chun Tin Street Project |
Gammon Engineering & Construction Co Ltd | Residential Development at KIL 11257, Sheung Shing Street, Ho Man Tin |
Gammon Engineering & Construction Co Ltd | Residential Development at TPTL No. 214, Fo Yin Road, Pak Shek Kok, Tai Po |
Leighton Contractors (Asia) Ltd | H2634 - Contract No. SS C505 - Construction of Liantang / Heung Yuen Wai Boundary Control Point |
New World Construction Company Limited | New World Centre Remodeling |
Nishimatsu Construction Co Ltd | Contract 902 Nam Fung Tunnel and Ventilation Buildings |
Hip Hing Construction Co Ltd | Proposed Residential Development at Lohas Park Package 5, Tseung Kwan O |
Chun Wo Construction Co Ltd | Design and Construction of Redevelopment of Kwai Chung Hospital (Phase 1) |
Shui On Building Contractors Ltd | Consturction of Public Rental Housing Development at Shek Kip Mei Estate Phase 3, 6 & 7 |
Yau Lee Construction Co Ltd | Contract No. SSD502 Design and Construction of Kwun Tong Staff Quarters at 4 Tseung Kwan O Road, Kowloon |
CR Construction Company Limited | Building Construction - Composite Development Project in Kwun Tong |
China Overseas Building Construction Ltd | Proposed Residential Development at S.T.T.L 605, Lok Wo Sha Lane, Ma On Shan |
Unistress Building Construction Ltd | Carcass Works Contract for URA Hai Tan Street / Kweilin Street and Pei Ho Street Development at NKIL 6506, Sham Shui Po, Kowloon |
Dragages Hong Kong Limited | Contract No. CV/2012/08 Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works |
Leader Joint Venture | Contract 1106 Diamond Hill Sttation Extension |